Halfway House

Last I heard, the stone work is done, the roof is probably done, siding too. On the interior, there's nothing happening - we're waiting for electrical and plumbing inspections. Once that's done, they can start putting up the drywall. Then it will start to look more like a house and less like a carefully-arranged bunch of sticks.


iPhone
A router will live near here.

The builder assures us that the standing water on the sub-floor is fine (roof wasn't water-tight and the windows are always open). Sigh.

Last I posted, a week ago, we were in the process of choosing the granite for the counters. Well, the fabricator has not given us any quotes yet, so we still don't know which stone (if any) fits in our preliminary budget. When Mrs. called the fabricator on Friday (8 days after we first met with her) the fabricator said she had been unable to contact the builder to get exact measurements for her estimates. My wife gave her the number for the cabinet people. And we still don't have a front door. I'm to the point where I think we should just go down to the local Lowes and pick one out of their stock. Screw the builder's preferred vendor, if he can't figure out how catalogs and price quotes work.

Wasting time, sitting still.