Housey

Siding is almost complete. It will be painted blue, someday.


iPhone

Electrical outlets, switches and in-ceiling lights have been tentatively placed (no wires, just the plastic boxes nailed to studs), for our approval. Plumbing is complete. We made a second pass at picking out cabinets on Saturday. And now we're awaiting the estimate from the cabinet place, to see if we can afford what we asked for. We've nearly decided on the floor: natural maple most places, and some streaky grey/white/black tile in the bathrooms.

We've decided to install solar panels on the house. So some big old trees have to come down. Which is a drag. But, free electricity!

2 thoughts on “Housey

  1. Woody Peckerwood

    I read your post about wanting a geothermal heat pump. I looked into that when my HVAC died. It was about three times what an 18 seer air-to-air regular system cost.

    Did you do it and, if so, why brand?

    1. cleek Post author

      yeah, we did (or, will – the HVAC people haven’t done their stuff yet). i’m not sure about the brand off the top of my head. i’d have to check the contract.

Comments are closed.